The 'FPSO FRADE' is moored by an internal turret and is able to accommodate 33 risers, has topsides ca-pacity for the production of 100000 barrels of oil treatment; compression of 106 million standard cubic feet of gas; and treatment and injection of 150,000 barrels of water per day.
The 'FPSO FRADE' is the most complex system the SBM has supplied in terms of topsides facilities with project duration of 36 months from signing of the contract in 2006.
MetroMac worked as a sub-contractor to SBM to carry out Instrument tubing jobs & electrical termination jobs for the topside which includes high pressure lines & hydraulic lines to about 1 inch SS tubes.
After the construction MetroMac carried out the pre-commissioning test for these installations.
The construction activities were carried out at Dry Docks World- Dubai.
|
IDNo:
|
7522318
|
Year:
|
1976
|
Name:
|
UNIVERSE FRONTIER
|
Keel:
|
|
Type:
|
Tanker
|
Launch Date:
|
14.01.1976
|
Flag:
|
LBR
|
Date of completion:
|
12.1976
|
DWT:
|
269574
|
Yard No:
|
2506
|
Length overall:
|
337.0
|
Ship Design:
|
|
LPP:
|
330.0
|
Country of build:
|
JPN
|
Beam:
|
54.5
|
Builder:
|
Ishikawajima-Harima
|
Material of build:
|
Location of yard:
|
Kure
|
|
Number of screws/Mchy/Speed(kn):
|
1ST-16
|
ON
|
LR/IMO
|
ID
|
Year
|
Name
|
Tons
|
Change
|
Registered Owner
|
7522318
|
7522318
|
1976
|
UNIVERSE FRONTIER
|
125465
|
Meridian Tptn Inc.
|
||
7522318
|
7522318
|
1976
|
ARISTOTLE S.ONASSIS
|
125465
|
1977
|
Southport Maritime Corp.
|
|
7522318
|
7522318
|
1976
|
LUCINA
|
125465
|
1990
|
Solena Sg Co.
|
|
7522318
|
7522318
|
1976
|
LU SAN
|
131677
|
2000
|
Xin Bo Sg Pte Ltd.
|
|
7522318
|
7522318
|
1976
|
AN
|
131677
|
2006
|
???
|
|
7522318
|
7522318
|
1976
|
FPSO FRADE
|
131677
|
2006
|
Single Buoy Moorings Inc.
|