FSO / FPSO > 200.000 DWT     |   home
FSO / FPSO > 200.000 DWT
Agbami FPSO
( All Photos Copyright John Goulet )
The Agbami FPSO was built by South Korea's Daewoo Shipbuilding & Marine Engineering.
Chevron Agbami FPSO Arrival in Nigerian Waters.
Chevron Agbami FPSO Arrival in Nigerian Waters.
Chevron Agbami FPSO Arrival in Nigerian Waters.
Chevron Agbami FPSO Arrival in Nigerian Waters.
( All Photos Copyright John Goulet )
 
Agbami FPSO in Nigerian Waters.

Agbami FPSO

The FPSO was built by South Korea's Daewoo Shipbuilding & Marine Engineering. In 2005, it awarded the contract for engineering design and procurement services for the topsides to KBR and the class contract to ABS.
With an overall storage capacity of 2.15 million barrels of crude oil, the Agbami FPSO, which arrived amid secrecy at the field at the end of 2007, is one of the largest facilities of this type ever built.
The Agbami development is expected to be of value to less-complex refiners, especially those with no vacuum residuum conversion. It has 13 topside modules containing the main process and utility systems. Weighing about 30,000t, the vessel topsides generate 75MW of power and have living quarters for 100 per-sonnel. It cost $1.2bn to construct.

The FPSO is moored in about 4,800ft of water, and at least 40 subsea wells will likely be necessary to fully exploit the field.
The vessel is designed to handle 250,000bpd, 450 million cubic feet of gas production and 450,000 barrels of injected water a day.
Designed to store about 2.2 million barrels of oil, the FPSO will be on location for more than 20 years.
Agbami is expected to be of value to less-complex refiners, especially those with no vacuum residuum conversion, limited hydrotreating / sulphur recovery and limited cracking capacity.