Flag
|
PANAMA
|
Class No.
|
0968737
|
Port of Registry
|
PANAMA
|
ITC Tons
|
95,054.00
|
Official No. / Call Sign
|
41440-10 / 3EZF9
|
RT on ITC
|
|
Keel Laid
|
2009-09-14
|
Gross Tons
|
95,054.00
|
Launching
|
2009-11-12
|
Deadweight MT
|
180,786.00
|
Built
|
2009-12-23
|
Navigation Area
|
Ocean Going
|
IMO No.
|
9452397
|
Official No.
|
41440-10
|
Signal Letters
|
3EZF9
|
Radio Installations
|
GMDSS A1+A2+A3
|
Ship's Name(English)
|
K. DAPHNE
|
Ship's Name(Korean)
|
|
Former Names
|
|
Owner
|
KOREA TONNAGE NO.66 SHIPPING COMPANY S.A.
|
Manager
|
KOREA LINE CORPORATION
|
Technical Manager
|
KLCSM CO., LTD.
|
Port of Registry
|
PANAMA
|
Flag
|
PANAMA
|
Class notations
-Hull
-Ship type
-Special feature
-Machinery
-Refrigerating. Installaion
|
+KRS1
BULK CARRIER 'ESP' (CSR)
BC-A (Hold Nos.2,4,6 & 8 may be empty) GRAB[20]
CLEAN1 IWS PSPC LG LI
UMA PMS BWE STCM
+KRM1
|
Special Description
|
|
Other Classification
|
|
Tonnnages
-Gross
-Gross on ITC
-Net on ITC
-Deadweight
|
95,054
95,054
60,025
180,786
|
Freeboard Summer(mm)
|
6617
|
Draft(m)
|
18.221
|
Speed(Kt)
|
14.90
|
Propulsion System of Ship
|
M
|
Overall Length(m)
|
292.00
|
Reg. Dimensions(L X B X D)(m)
|
292.00 X 45.00 X 24.80
|
Rule Dimensions(L X B X D)(m)
|
283.00 X 45.00 X 24.80
|
No. of Decks
|
1DK
|
Bottom Framing
|
LF
|
No. of Trans. Bulkheads
|
10 W/T
|
Type of Superstructure
|
|
Kind of Chain
(Required Diameter(mm))
|
Grade III (107.0)
|
Cargo type & Capacity(m3)
|
|
Tank type & Capacity(m3)
|
FO 4545.7 FW 513.3 WB 57871.5
|
Hatchway Number & Size(m)
|
1 (15.81 X 15.30) 2 (15.81 X 20.40) 3 (15.81 X 20.40) 4 (15.81 X 20.40) 5 (15.81 X 20.40) 6 (15.81 X 20.40) 7 (15.81 X 20.40) 8 (15.81 X 20.40) 9 (15.81 X 15.30)
|
No. & (SWL) of Derricks/Cranes
|
|
No. & Type of Engine
Bore & Stroke
Output kW/rpm
|
1D: 2 SA 6 CY
700X2800
18660.00/91.0
|
No. & Kind of Boiler
Pressure(kg/cm2)
Heating Surface
|
1Auxiliary Boiler CPB
8.8
354.0
|
No. & Capacity of Generator
|
3 X AC 1125KVA 450VOLT
|
Shipbuilder
Place of Built
Date of Built
|
STX OFFSHORE & SHIPBUILDING CO., LTD.
JINHAE
23.12.2009
|
Date of Conversion
|
|
Hull No.
Date of Keel Laid
Date of Launching
|
S-1285
14.09.2009
12.11.2009
|
Engine Builders
Place of Manufacturer
Date of Manufacturer
|
STX HEAVY INDUSTRIES CO., LTD
CHANGWON
09.2009
|
Boiler Makers
Place of Manufacturer
Date of Manufacturer
|
KANG RIM IND. CO., LTD.
CHANGWON
06.2009
|