Auke Visser's International Super Tankers     |   home
VLCC - TANKERS - INDEX Original name beginning with E
Eneos Earth
 "Eneos Earth", source, location and date unknown.
"Eneos Earth" at Singapore, October 28th, 2019.
( Photo Copyright Martin Klingsick )
"Eneos Earth" at Singapore, October 4th, 2019.
( Photo Copyright     Andreas Schlatterer )
"Eneos Earth" in the Straith of Akashi, underway to the Persian Gulf fromMizushima, Japan, 15 februari 15th, 2019.
( Photo Copyright italymaru4 )
"Eneos Earth" in the Straith of Akashi, underway to the Persian Gulf fromMizushima, Japan, 15 februari 15th, 2019.
( Photo Copyright italymaru4 )
"Eneos Earth" at Mizushima, Japan, February 13th, 2019.
( Photo Copyright M. Kageyama )
"Eneos Earth" at Mizushima, Japan, February 13th, 2019.
( Photo Copyright M. Kageyama )

Ship info :
ENEOS EARTH - IMO n° 9814131
Flag (Panama)
Call Sign 3EWC9
MMSI 374542000
Gross tonnage 160723 (since 01/12/2018)
DWT 312175
Type of ship Crude Oil Tanker (since 01/12/2018)
Year of build 2018
Status In Service/Commission (since 27/12/2018)
Last update of ship particulars 03/03/2020

The Miramar Ship Index for
ENEOS EARTH
IDNo / IMO
9814131
Year
2018
Name
ENEOS EARTH
Flag
PAN
Owner
Freret Shipping SA
Type
Tanker
Tons
160723
DWT
312175
LOA
339.50
LPP
334.90
Beam
60.00
Dept
28.50
Draft
21.09
Machinery
1D-
kW
22800
ShipDesign
VLCC
Builder
JMU Ariake Ship Yard
Yard
Ariake
Yard No
5137
Country built
JAP
Keel
12.12.2015
Launch
12.10.2018
Completed
27.12.2018
Subsequent History
None
End
----
Disposal Data
----

ClassNK Register of Ships
Last update : 14 Jan 2020

Classification No. :
183692
IMO No. :
9814131
Official No. :
50135-19
Signal Letters :
3EWC9
Flag :
Panama
Port of Registry :
Panama
Ship's Name :
ENEOS EARTH
Former Name 1 :
--
Registered Owner 1 :
FRERET SHIPPING S.A.
Management Company 1 :
--
Classification Characters, Notations :
NS*(CSR, TOB, PSPC-WBT, PSPC-COT, NC)(ESP)(IWS)(EA)(IHM)(SOx(EGCS)) MNS*(M0)
Descriptive Notes
Design Condition :
Complied with Part CSR-B&T of the Rules for the Survey and Construction of Steel Ships
Other :
SOx-EGCS-M/E, G/E(Nos.1, 2, 3)
Installation Characters :
CHG, MPP, LSA, RCF, M0, AFS, BWM
Installation Descriptive Notes
Automatic and Remote Control Systems :
The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description :
--
Other Classification :
--
Type of Ship -Purpose(intended service) :
OIL CARRIER
- Certificates - SC/SE/SF :
Oil tanker
- OPP :
Oil tanker
- EE :
Tanker
- SMC/ISSC :
Oil tanker
Tonnage Gross (Registered) :
160,723
Tonnage Net (Registered) :
106,460
Tonnage Gross (Local) :
--
Tonnage Net (Local) :
--
Tonnage Gross (TM69) :
160,723
Tonnage Net (TM69) :
106,460
Deadweight :
312,175
Summer Freeboard (mm) :
7,472
Summer Draught (m) :
21.085
Lf (m) :
334.930
Continuous Max. Speed (kt) (Sea Trial) :
--
Equipment No. :
7,369
Overall Length (m) :
339.500
Moulded LxBxD (m) :
334.900 x 60.000 x 28.500
Registered LxBxD (m) :
334.930 x 60.000 x 28.500
Cargo Capacity (m3 / No. of Containers, etc.) :
L 350,910.30
No. of Passengers :
--
Capacity of Tanks (m3) :
FO 7,026.00 FW 1,074.00
Lifeboats Type, No. & Person :
1 2x(30)
Rescue Boats Type, No. & Person :
1 1x(6) (at combined use for lifeboat)
Liferafts Type, No. & Person :
1 1x(6) 1 4x(16)
Radio Installations :
GMDSS A1+A2+A3
Navigation Equipment :
MC, GYRO, HCS, ECDIS, GPS, RDX, RDS, ARPA, AIS, VDR, LOG, LOG(G), ES, ROT, STGTEL, DSL, LRIT, BNWAS
No. & Kind of Engines :
1DE : 2 SA 7 CY
Bore x Stroke (mm) :
820.0 x 3,375.0
Power (kW) :
22,800
Revolution (rpm) :
66.0
Manufacturer :
DIESEL UNITED, LTD.
No. & Kind of Boilers :
1 AUX WTB
Pressure (MPa) :
2.20
Evaporation :
82.87 (ton/h)
Manufacturer :
Mitsubishi Heavy Industries Marine Machinery & Equipment Co., Ltd.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
No. & Capacity of Generators (kVA) :
4 AC 5,049
Kind of Propeller Shaft :
1C
No. & Shaft Diameter (mm) :
1 x 880
Shipbuilder :
JAPAN MARINE UNITED CORPORATION ARIAKE SHIPYARD
Hull No. :
5137
Date of Keel Lay :
12 Dec 2015
Date of Launch :
12 Oct 2018
Date of Build :
27 Dec 2018
Date of Conversion :
--