The Miramar Ship Index for
|
NEW DREAM
|
IDNo / IMO
|
9689976
|
Year
|
2014
|
Name
|
NEW DREAM
|
Flag
|
HKG
|
Owner
|
New Dream Shipping Company Limited
|
Type
|
Tanker
|
Tons
|
165209
|
DWT
|
318570
|
LOA
|
333,00
|
LPP
|
327,00
|
Beam
|
60,00
|
Dept
|
30,60
|
Draft
|
20,50
|
Machinery
|
1D-15
|
kW
|
24380
|
ShipDesign
|
VLCC
|
Builder
|
Shanghai Waigaoqiao Shipbuilding Co., Ltd.
|
Yard
|
Shanghai
|
Yard No
|
1305
|
Country built
|
CHN
|
Keel
|
21.02.2014
|
Launch
|
????
|
Completed
|
12.11.2014
|
Subsequent History
|
None
|
End
|
----
|
Disposal Data
|
----
|
IMO number :
|
9689976
|
|
Name of ship :
|
NEW DREAM
|
(since 01/11/2014)
|
Call Sign :
|
VRNK9
|
|
MMSI :
|
477848800
|
|
Gross tonnage :
|
165209
|
(since 01/11/2014)
|
DWT :
|
318570
|
|
Type of ship :
|
Crude Oil Tanker
|
(since 01/11/2014)
|
Year of build :
|
2014
|
|
Flag :
|
Hong Kong, China
|
(since 01/11/2014)
|
Status of ship :
|
In Service/Commission
|
(since 12/11/2014)
|
Last update :
|
12/01/2016
|
PARTICULAR
|
||
Name of Ship:
|
NEW DREAM
|
|
Class No.:
|
14N0197
|
|
IMO No.:
|
9689976
|
|
Type of Ship:
|
Oil Tanker, Double Hull
|
|
Call Sign:
|
VRNK9
|
|
Official No.:
|
HK-4123
|
|
Flag:
|
Hong Kong, China
|
|
Port of Registration:
|
Hong Kong
|
|
Class Character and Notations:
|
?CSA
|
Oil Tanker, Double Hull
PSPC(B,C);F.P. = 60?;ESP;In-Water Survey;Emergency Towing Arrangements;Single Point Mooring;CSR;BWMP(MEPC.127(53));Loading Computer (S, I, D);CM;
|
?CSM
|
BWMS;AUT-0;SCM;PMS;IGS;VCS;
|
|
Class Status:
|
Classed
|
|
Service Status:
|
In service
|
|
Dual Class:
|
LR
|
|
Double Class:
|
Owner/Manager Information :
|
|
Owner:
|
New Dream Shipping Company Limited
|
Operator:
|
Associated Maritime Co.,( Hong Kong ) Ltd.
|
Ship General Information:
|
Principal Particulars
|
|||||
Length(LOA):
|
333.00
|
Length(LBP):
|
327.00
|
||
Moulded Breadth:
|
60.00
|
Moulded Depth:
|
30.60
|
||
Deadweight:
|
318570.00
|
Draft:
|
20.50
|
Tonnage
|
||
Regulation
|
Gross Tonnage
|
Net Tonnage
|
ITC 69
|
165209
|
107763
|
National (if any)
|
0.00
|
0.00
|
Dates
|
|||
Contract:
|
2013-09-16
|
Keel Laid:
|
2014-02-21
|
Date of Built:
|
2014-11-12
|
Delivery:
|
2014-11-12
|
Date of Major Conversion* Contract
|
Date of Major Conversion* Completed
|
Builder
|
|||
Builder
|
Shanghai Waigaoqiao Shipbuilding Co., Ltd. China
|
Yard No.
|
H1305
|
Hull Characteristics:
|
Primary Material:
|
Steel
|