The Miramar Ship Index for
|
PROTEUS
|
IDNo / IMO
|
9959216
|
Year
|
2023
|
Name
|
PROTEUS
|
Flag
|
BHS
|
Owner
|
Ravenna Ent., Ltd.
|
Type
|
Bulk Carrier
|
Tons
|
93367
|
DWT
|
182479
|
LOA
|
292.0
|
LPP
|
288.4
|
Beam
|
45.0
|
Dept
|
24.55
|
Draft
|
18.23
|
Mach.
|
1D-??
|
Power
|
12100
|
Design
|
Bulk Carrier
|
Japan Marine United Corp.
|
|
Yard
|
Ariake
|
Yard No
|
5296
|
Built
|
JPN
|
Keel
|
22.02.2023
|
Launch
|
12.05.2023
|
Compl.
|
12.07.2023
|
Subsequent History
|
None
|
End
|
----
|
Disposal Data
|
----
|
ClassNK Register of Ships
|
Last update : 22 Nov 2023
|
Classification No. :
|
232592
|
IMO No. :
|
9959216
|
Official No. :
|
7001562
|
Signal Letters :
|
C6GO5
|
Flag :
|
Bahamas
|
Port of Registry :
|
Nassau
|
Ship's Name :
|
PROTEUS
|
Former Name 1 :
|
--
|
Registered Owner 1 :
|
RAVENNA ENTERPRISES LTD.
|
Management Company 1 :
|
--
|
Classification Characters, Notations :
|
NS*(CSR, BC-A, BC-XII, GRAB 35, PSPC-WBT, NC, 1C)(ESP)(HCM-GBS)(IWS)(PSCM)(IHM)(EEDI-p3)(NOx-III(SCR))(SOx(EGCS)) NS*
|
Descriptive Notes
|
|
Design Condition :
|
Complied with Part CSR-B&T of the Rules for the Survey and Construction of Steel Ships / Strengthened for heavy cargo loading where hold nos. 2,4,6 & 8 may be empty
|
Other :
|
NOx-III(2021)(M/E : SCR), (G/E(Nos.1, 2, 3) : SCR) / SOx-EGCS-M/E, G/E(Nos.1, 2, 3)
|
Installation Characters :
|
MPP, LSA, RCF, M0, AFS, BWM
|
Installation Descriptive Notes
|
|
Automatic and Remote Control Systems :
|
The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
|
Special Description :
|
--
|
Other Classification :
|
--
|
Type of Ship -Purpose(intended service) :
|
BULK CARRIER
|
- Certificates - SC/SE/SF :
|
Bulk carrier (SOLAS IX Reg. 1.6)
|
- OPP :
|
Other than Oil Tanker
|
- EE :
|
Bulk carrier
|
- SMC/ISSC :
|
--
|
Tonnage Gross (Registered) :
|
93,367
|
Tonnage Net (Registered) :
|
59,349
|
Tonnage Gross (Local) :
|
--
|
Tonnage Net (Local) :
|
--
|
Tonnage Gross (TM69) :
|
93,367
|
Tonnage Net (TM69) :
|
59,349
|
Deadweight :
|
182,478.6
|
Summer Freeboard (mm) :
|
6,381
|
Summer Draught (m) :
|
18234
|
Lf (m) :
|
288420
|
Continuous Max. Speed (kt) sp; (Sea Trial) :
|
--
|
Equipment No. :
|
5,096
|
Overall Length (m) :
|
292000
|
Moulded LxBxD (m) :
|
288.400 x 45.000 x 24.550
|
Registered LxBxD (m) :
|
288.420 x 45.000 x 24.550
|
Cargo Capacity (m3 / No. of Containers, etc.) :
|
G 195,291.00
|
No. of Passengers :
|
--
|
Capacity of Tanks (m3) :
|
FO 3,981.00 FW 448.00
|
Lifeboats Type, No. & Person :
|
--
|
Rescue Boats Type, No. & Person :
|
--
|
Liferafts Type, No. & Person :
|
--
|
Radio Installations :
|
--
|
Navigation Equipment :
|
--
|
No. & Kind of Engines :
|
1DE : 2 SA 7 CY
|
Bore x Stroke (mm) :
|
600.0 x 2,400.0
|
Power (kW) :
|
12,1
|
Revolution (rpm) :
|
82.0
|
Manufacturer :
|
HITACHI ZOSEN CORPORATION ARIAKE WORKS
|
No. & Kind of Boilers :
|
1 AUX VB
|
Pressure (MPa) :
|
0.70
|
Evaporation :
|
3.67 (ton/h)
|
Manufacturer :
|
OSAKA BOILER MFG. CO., LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
|
No. & Capacity of Generators (kVA) :
|
4 AC 3,250
|
Kind of Propeller Shaft :
|
1C
|
No. & Shaft Diameter (mm) :
|
1 x 670
|
Shipbuilder :
|
JAPAN MARINE UNITED CORPORATION ARIAKE SHIPYARD
|
Hull No. :
|
5296
|
Date of Keel Lay :
|
22-02-2023
|
Date of Launch :
|
12-05-2023
|
Date of Build :
|
12-07-2023
|
Date of Conversion :
|
--
|