GAS-Carriers E - H > 50,000 CBM ( Part - 2 )
Galea
On Board Photos "Galea" - Part - 3
( All photos Copyright John Gow )
Prop shaft, thrust block, gear box - looking forward
Bottom Plates - Ballast pumps, auxiliary condenser
Main engine gauge board
Centralised Control Room
DCS (Distributed Control System) station showing Boiler Burner Management System control
(  John Gow : Ok things have changed, but the basics are still the same. We still send the 4/E to check
the flame pattern through the sighting port and can spin the CCTV camera around onto the funnel.
We also have a hand ignitor, automation is great when it's working but we should all know how to do
things manually as sometimes you need to. )
DCS stations and turbine control
Engine control - telegraph

The End.

( All photos Copyright John Gow )