Flag
|
HONG KONG (CHINA)
|
Class No.
|
1100021
|
Port of Registry
|
HONG KONG
|
ITC Tons
|
93,196.00
|
Official No. / Call Sign
|
HK-4730 / VRQI8
|
RT on ITC
|
|
Keel Laid
|
2010-12-10
|
Gross Tons
|
93,196.00
|
Launching
|
2011-04-30
|
Deadweight MT
|
179,259.00
|
Built
|
2011-06-08
|
Navigation Area
|
Ocean Going
|
IMO No.
|
9569798
|
Official No.
|
HK-4730
|
Signal Letters
|
VRQI8
|
Radio Installations
|
GMDSS A1+A2+A3
|
Ship's Name(English)
|
SOLAR FRONTIER
|
Ship's Name(Korean)
|
|
Former Names
|
|
Owner
|
TAICHI INTERNATIONAL SHIP LEASE CO., LIMITED
|
Manager
|
POLARIS SHIPPING CO.,LTD.
|
Technical Manager
|
POLARIS SHIPPING CO.,LTD.
|
Port of Registry
|
HONG KONG
|
Flag
|
HONG KONG (CHINA)
|
Class notations
-Hull
-Ship type
-Special feature
-Machinery
-Refrigerating. Installaion
|
KRS1
BULK CARRIER 'ESP' (CSR)
BC-A (Hold Nos. 2, 4, 6 & 8 may be empty) GRAB[30]
CLEAN1 IWS PSPC LG LI
UMA PMS BWE STCM
KRM1
|
Special Description
|
|
Other Classification
|
|
Tonnnages
-Gross
-Gross on ITC
-Net on ITC
-Deadweight
|
93,196
93,196
59,298
179,259
|
Freeboard Summer(mm)
|
4034
|
Draft(m)
|
18.322
|
Speed(Kt)
|
15.20
|
Propulsion System of Ship
|
M
|
Overall Length(m)
|
292.00
|
Reg. Dimensions(L X B X D)(m)
|
284.22 X 45.00 X 24.80
|
Rule Dimensions(L X B X D)(m)
|
279.40 X 45.00 X 24.80
|
No. of Decks
|
|
Bottom Framing
|
|
No. of Trans. Bulkheads
|
|
Type of Superstructure
|
|
Kind of Chain
(Required Diameter(mm))
|
|
Cargo type & Capacity(m3)
|
Bale : 187465? Grain : 197331?
|
Tank type & Capacity(m3)
|
FO 4803.4 FW 554.2 WB 55747.9
|
Hatchway Number & Size(m)
|
1 (15.64 X 17.20) 2 (15.64 X 20.60) 3 (15.64 X 20.60) 4 (15.64 X 20.60) 5 (15.64 X 20.60) 6 (15.64 X 20.60) 7 (15.64 X 20.60) 8 (15.64 X 20.60) 9 (15.64 X 17.20)
|
No. & (SWL) of Derricks/Cranes
|
|
No. & Type of Engine
Bore & Stroke
Output kW/rpm
|
1D: 2 SA 6 CY
700X2800
18660.00/91.0
|
No. & Kind of Boiler
Pressure(kg/cm2)
Heating Surface
|
1Auxiliary Boiler CPB
8.0
295.0
|
No. & Capacity of Generator
|
3 X AC 912KVA 450VOLT
|
Shipbuilder
Place of Built
Date of Built
|
SUNGDONG SHIPBUILDING & MARINE ENGINEERING CO., LTD.
TONGYEONG
08.06.2011
|
Date of Conversion
|
|
Hull No.
Date of Keel Laid
Date of Launching
|
S1096
10.12.2010
30.04.2011
|
Engine Builders
Place of Manufacturer
Date of Manufacturer
|
HYUNDAI HEAVY INDUSTRIES CO., LTD.
ULSAN
01.2011
|
Boiler Makers
Place of Manufacturer
Date of Manufacturer
|
KANGLIM C.S.P. CO., LTD.
CHANGZHOU
12.2010
|